AI Compute Campus Power: One Cable Plan for the Whole Site

OUZHI Cable (欧智电缆) — campus infeed to GPU rack, one factory

A 100 MW AI campus is a power project before it is a compute project. We design the 26/35 kV campus infeed, the multi-building MV distribution, and the high-density rack feeders as one coordinated cable plan — sized for staged GPU expansion.

Four Constraints That Define an AI Campus

AI campuses break the assumptions of traditional data center design: rack density, ramp speed, cooling medium and power quality all change at once.

01
Campus-Level 35 kV Infeed
A single 26/35 kV backbone from the utility to the campus, sized for the final build-out rather than phase one — trenching once is far cheaper than trenching twice.
02
130 kW+ GPU Racks
High-density racks need dedicated feeders with tight voltage-drop limits and generous copper — the busbar is not the constraint, the cable path is.
03
Liquid-Cooling Ready
Liquid-cooled halls run hotter ambient and higher continuous load; cable current ratings must be de-rated for the real room temperature, not the design brochure.
04
Power Quality
Thousands of switched-mode PSUs create harmonic currents. We specify cable and earthing so the distribution does not become the harmonic bottleneck.

Campus Cable Plan by Build Stage

A staged reference for an AI campus — final engineering by your MEP consultant and utility agreement.

Stage / PositionTypical CableRatingPlanning Note
Utility to campus substationXLPE MV backbone26/35 kV, 240–630 mm²Size for final build-out
Campus substation to buildingsMV distribution feeder26/35 kV, 95–300 mm²Reserve one spare feeder
Building to GPU hallMV feeder / LV infeed26/35 kV or 0.6/1 kVMatch hall PUE
Hall to rack rowFlexible high-strand copper0.6/1 kV, 95–240 mm²130 kW+ rack, tight drop

The Capacity Planning Mistake That Costs a Year

Sizing the campus infeed for phase one looks prudent until the GPU order doubles. The extra cost of one larger conductor at construction is a fraction of re-trenching and re-permitting later. Plan the cable for the final megawatt target, install the first phase.

FAQ — AI Campus Cable Buyers

How do I size the campus infeed?
Start from final IT megawatts, multiply by target PUE, add diversity and growth margin, then convert to current at your voltage. We will run this calculation with you before quoting.
Can one supplier cover the whole campus?
Yes — MV backbone, building feeders, LV hall cable and rack feeders from one factory, with consistent test reports and one point of responsibility.
Do liquid-cooled halls need different cable?
The cable construction can be the same, but current ratings must be recalculated for the real ambient. A cable rated at 30 °C loses capacity in a 45 °C liquid-cooled hall.
How fast can you deliver for a phased build?
Standard MV 3–5 weeks; large backbone sections 5–8 weeks. We schedule deliveries to your rack-installation sequence so drums arrive when the hall is ready.

Related Product Pages

Compare the cable construction for your application — each page covers the standards, ratings and procurement checks that matter at the quotation stage.

Let's Discuss Your 35 kV Cable Project

Tell us your project location, voltage and cable requirements. Our export engineers will reply within 24 hours with a tailored solution and factory-direct quotation.

Email: info@ouzcable.com
Phone: +998 99 851 6999
WhatsApp: +998 99 851 6999
Telegram: @H99G99
HQ: China · Export Worldwide
Website: www.ouzcable.com